ABOUT

Solutions & Cases

Our Case
  • FAQ's FAQ's

    What is a tunnel boring machine? A tunnel boring machine ( TBM ) is used to dig tunnels. It consists of a cutter head and trailing gear that carries support equipment and moves excavated material out of the tunnel.

  • Port Miami Tunnel Wikipedia

    The Port of Miami Tunnel project involved the design and widening of the MacArthur Causeway by one lane in each direction leading up to the tunnel entrance, the relocation of Parrot Jungle Trail, and the reconstruction of roadways on Dodge Island.The tunnel itself has two side by side tubes carrying traffic underneath the cruise ship channel of the Government Cut shipping lane.

  • TUNNEL BORING MACHINE (TBM) TUNNELING Port Miami

    The construction of the Port of Miami Tunnel project broke ground in May 2010 and is scheduled to be completed in May 2014. TBM PRODUCTION: Production of the TBM parts ran from March material is carried back through the trailing gear on an enclosed conveyor belt or pumped through pipes and deposited outside the tunnel entrance, or portal

  • Home Lehigh Cement New Windsor Quarry Project

    The conveyor is designed to be underground at five (5) of six (6) road crossings, three (3) streams and at some agricultural areas. The underground tunnel sections are constructed with cast-in-place concrete, with the longest section running 6,405 linear feet in length and a maximum depth of 60 feet.

  • Success for new EPBM solution in Miami TunnelTalk

    Hundreds of spectators attended final breakthrough of the second bore of the 1.2km-long tunnel on May 6, 2013. The 12.86m diameter machine completed both drives, connecting Watson Island with Miami Port on Dodge Island, in just 17 months. Top performances were 18.7m of excavated and lined tunnel in a single day, and 100.5m in a single week.

  • Port of Miami Tunnel Project Progress Report August

    Conveyor Support Foundation Plans The project’s outreach efforts have generated a total of 2,615 people who have worked on the Port of Miami Tunnel Project since inception. This total number includes direct hires by the design‐build contractor Bouygues Civil Works Florida (BCWF) as well as those persons working on the project through

  • Excavation wraps up on Miami Port link TunnelTalk

    May 10, 2013· Client for the project comprises three public agencies: the Florida State Department of Transportation (FDOT), Miami-Dade County and the City of Miami. FDOT will make annual operating and maintenance payments to MAT once it is passed into service. Gallery. References First drive through for Miami Port link TunnelTalk, August 2012

  • Belt Conveyor

    Conveyor Belt For Miami Port Tunnel Project. More Details >> Difirent Type For Belt Conveyor Pdf. More Details >> Conveyor Belt Manufacturing Companies Gurgaon.

  • Belt Conveyors TAKRAF

    A train system was replaced with a chain of belt conveyors. The main conveyors at this project are the tunnel conveyor PC 2 and the overland conveyor PC 3. Tunnel conveyor PC 2. With 16,820 m pulley center distance and 471 m lift this conveyor is still one of the largest conveyors worldwide.

  • Awarding of the World’s Most Powerful Belt Conveyor System

    The conveyor system will be installed with advanced gearless drive technology with the uphill tunnel conveyors boasting the highest drive power ever to be installed on a belt conveyor. In fact, total

  • Conveyor technology at one of the largest copper mines in

    May 27, 2020· In order to achieve this feat, it was necessary to use newly developed components that redefine the performance limits of belt conveyor technology. St 10 000 quality conveyor belts from ContiTech were used for the first time. Operating belt safety ratings of S = 5.0 required belt

  • TUNNEL BORING MACHINE (TBM) TUNNELING Port

    The construction of the Port of Miami Tunnel project broke ground in May 2010 and is scheduled to be completed in May 2014. TBM PRODUCTION: Production of the TBM parts ran from March material is carried back through the trailing gear on an enclosed conveyor belt or pumped through pipes and deposited outside the tunnel

  • Belt Conveyors TAKRAF

    A train system was replaced with a chain of belt conveyors. The main conveyors at this project are the tunnel conveyor PC 2 and the overland conveyor PC 3. Tunnel conveyor PC 2. With 16,820 m pulley center distance and 471 m lift this conveyor

  • NELSON POINT/FINUCANE ISLAND IRON ORE Project in Port

    Project designed to cart ore from Nelson Point to Finucane Island stockpiles. Conveyor expected to be 1.8m wide with capacity to move 4,000tph lump ore with full capacity of 10,000tph (ore) envisaged. This conveyor is to link up with the overland system during first half of 1997. Harbour Tunnel

  • Port of Miami Tunnel cbna-construction

    TWIN-TUBE SUBSEA ROAD TUNNEL CONCESSION UNDERGROUND WORKS United States, 2009-2014 GENERAL DESCRIPTION Under a 35-year public-private-partnership deal, design and construction of a twin tube sub-sea road tunnel (2 x 1200 m) aimed at relieving downtown Miami traffic congestion on the roads leading to the Port of Miami. A $700+ million construction project.

  • Clients: Coal Projects Overland Conveyor

    A 14 km overland conveyor from the port to the new Ultra Mega 3,960 MW power plant. The overland includes head tail drives and two horizontal curves. PT Adaro, Tutupan, Indonesia Commissioning

  • Acciona Ghella Joint Venture and Bane Nor nominated for

    Acciona Ghella Joint Venture and Bane Nor have been nominated for the “major project of the year” at the ITA Tunnelling Awards 2019.. The EPC TBM Follo Line Project is by far the largest Tunnel Boring Machine project in Norway.Four double-shield TBM’s, all of which have been deployed from the same starting point, have been excavating more than 36 km of tunnel

  • Manual Port Dust Management Manual

    Iron Ore Controlled Document Procedure Port Dust Management Manual Document- 0099702 Version No: 5.0 Page 3 of 50 This document is uncontrolled when printed or downloaded and should be

  • Mining EU Solution INVT Solutions

    According to customers' needs, INVT has provided various belt conveyor, hoist, winch, emulsion pump, mine fans, pumps and other products solutions for the coal mine industry. INVT GD5000 AFE Medium Voltage Drive for 15.56km Tunnel Hoist Regenerative Project

  • Evergreen Line Rapid Transit Project

    of the tunnel is approximately 50 m at the deepest point, with depths ranging between 17 and 50 m. The TBM was 10 m in diameter and 11 m long. It extended to 85 m when attached to trailing gear that used a conveyor belt system to remove tunnel spoils and assist in the installation of concrete tunnel

  • Miami Ground Machine: The Enormous, Record-Setting Florida

    Oct 07, 2011· The Port of Miami Tunnel Project's massive tunnel-boring machine will begin carving out sister tunnels for the thriving hub this month. The crushed rock sludge then rides on a conveyor

  • Construction overview Tunnels West Gate Tunnel Project

    The West Gate Tunnel Project will be built over five years, opening in 2022 to provide a vital alternative to the West Gate Bridge, quicker and safer journeys and remove over 9000 trucks from residential streets in the inner west. The project

  • Used Cooler Equipment — Machine for Sale

    Equipped with 28" wide x 300" long neoprene belt, with 1½" product clearance, (5) 60" long tunnel sections with air tight polyurethane hoods and self contained chiller. Control panel has conveyor on /